Link to Public Works

City of Peachtree City SPLOST Projects

Per the May 2004
Resolution No. 2004-09, Exhibit A

More Photos of SPLOST Projects in Peachtree City

  • Adams Falls
  • Adell Court
  • Arbor Gate
  • Arrowhead Court
  • Auburn Court
  • Axalea Drive
  • Banks Run
  • Bedford Park
  • Bluegill Trace
  • Bluegrass Trace
  • Boxwood Court
  • Braelinn Courts
  • Brookwood Drive
  • Cedar Drive
  • Chadwick Drive
  • Chardonay Courts
  • Charter Oak Court
  • Claridge Curve
  • Commerce Court
  • Commerce Drive – SR 54 to Westpark Drive
  • Copperplate Lane
  • Crescent Oak
  • D-Bob
  • Dover Trail
  • Falcon Drive
  • Fen Way
  • Fortress Drive
  • Glendale Drive
  • Golfview Drive
  • Grecken Green
  • Greensway
  • Groveland Drive
  • Harbor Loop
  • Haven Ridge
  • Hedgewood Lane (West)
  • Heritage Way
  • Hickory Drive
  • Hilltop Drive (East)
  • Hip Pocket Road
  • Holly Grove Road – Robinson Road to Rubicon Road
  • Ironwood Way
  • Kelly Drive – SR 74 East to Flat Creek Bridge
  • Kensington Drive
  • Kenton Place
  • Kimmer Road
  • Kings Court
  • Kings Ridge
  • Korinna Court
  • Lanyard Loop
  • Line Creek Circle
  • Line Creek Drive
  • Log House Road
  • Longwood Lane
  • Magnolia
  • Marks Style
  • Mattan Point
  • Oakdale Avenue
  • Olive Drive – Hip Packet West
  • Paschall Road – CSX RR Tracks to Dividend Drive
  • Peachtree Parkway – Battery Way SR 54
  • Peachtree Parkway – SR 54 to Battery Way
  • Peachtree Parkway – SR 54 to SR 74
  • Pinegate Road – Riley Parkway to Sevenoaks
  • Pinnacle Court
  • Postwood Turn
  • Preserve Parkway
  • Prestwick Lane
  • Raintree Hill
  • Redwine Road
  • Robinson Road – Braelinn Road to Redwine Road
  • Robinson Road – Crosstown Drive to Peachtree Parkway
  • Robinson Road – Peachtree Parkway to Braelinn Road
  • Robinson Road – SR 54 to Crosstown Drive
  • Rock Mull
  • Rock-a-Way Road – SR 74 West to County Line
  • Rolling Green
  • Rosewood Court
  • Rubicon Road
  • Ruskin Road
  • Sandtrap Ridge
  • Sautern Way
  • Sawleaf Lane
  • Sawmill Trace
  • Saybrook Court
  • Skiff Trace
  • Springridge Court
  • Summer Place
  • Tammerlane
  • TDK Boulevard – Dividend Drive to RR Bridge
  • TDK Boulevard – SR 74 to RR Bridge
  • Terrace Tay
  • Vardon Way
  • Walt Banks Road – Peachtree Parkway West
  • Wensley Corner
  • West Manor
  • Wexford Way
  • White Oak Trail
  • Wickerhill
  • Windgate Court
  • Wisdom Road’
  • Woodland Drive
  • Wynnmead Parkway – Kings Ridge North to end
  • Wynnmeade Parkway – SR 54 to Kings Ridge
  • Crosstown Drive @ Robinson Road – Construct Roundabout
  • Hwy. 54 – Gateway Cartpath Bridge – Construct multi-use bridge        over SR 54 West of MacDuff Parkway
  • MacDuff Parkway Improvements – Phase I – 2 to 4 lanes, first ¾ mile to Community Collector standards
  • MacDuff Parkway Landscaping – Landscape first 3,500 LF of roadway
  • Market Place/Westpark Multi-Use Tunnel – Construct tunnel from Westpark area under SR 74 to Marketplace Development
  • Park Place Drive extension – New access road north of Wisdom Road
  • Paschall Road/Hwy. 74 Multi-Use Tunnel – Construct tunnel under SR 74 north of Paschall Road
  • Peachtree Parkway @ Braelinn Road – Turn lanes
  • Peachtree Parkway N – Intersection Improvements – Construct left turn lanes (Loring, Tinsley Mill)
  • Peachtree Pkwy @ Walt Banks – Construct Roundabout
  • Redwine @ Robinson improvements – Turn lanes and signal
  • Rockaway Road Realignment – Realign road to intersect with Holly Grove Road
  • SR 54 – East Multi-Use Bridge – Construct cart path bridge over SR 54 in Walt Banks area
  • SR 54 – East Multi-Use Bridge – Replace cart path bridge over Lake Peachtree with wider section
  • SR 54 A Stevens Entry – Turn lanes and signal
  • SR 74 @ Cooper Circle South – Turn lanes and signal
  • SR 74 @ Wisdom Road – Traffic signal with minor lane improvements
  • SR 74 South Frontage Road – Construct 1,500 LF frontage road from future median cuts at Gilroy’s South to Avery-Dennison
  • SR 75 – North Multi-Use Bridge – Construct path system bridge over SR 74
  • TDK @ Dividend Drive – Add right turn lanes
  • Upgrade Cart Path System – Widen & resurface key paths to 12 feet
  • Upgrade RR Crossing Signals – Purchase private crossings, upgrade existing ones to quiet zone standard
  • Street Resurfacing – Locations to be determined by roadway condition assessment

 

Please contact Peachtree City for additional information on City SPLOST projects (http://www.peachtree-city.org/).

Link to Administative Services