104 Broom Blvd Status: Completed Last Updated: October 03, 2022 Project Completed: September 09, 2019

Budgeted & Pending
In Design
Under Construction
Completed
  • picture072.jpg
  • picture073.jpg
  • picture074.jpg
  • picture075.jpg
  • picture076.jpg
  • picture077.jpg
  • picture078.jpg
  • picture079.jpg
  • picture080.jpg
  • picture081.jpg
  • picture082.jpg
  • picture083.jpg
  • picture084.png
  • picture085.jpg
  • picture086.jpg
  • picture087.jpg
  • picture088.jpg
  • picture089.jpg
  • picture090.jpg
  • picture091.jpg
  • picture092.jpg
  • picture093.jpg
  • picture094.jpg
  • picture095.jpg
  • picture096.jpg
  • picture097.jpg
  • picture098.jpg
  • picture099.jpg
Click Here for Project Updates

This project is complete.  The stormwater system and road were damaged during the December 2015 flood event. The headwall and inlet of the 36” corrugated metal pipe (CMP) were crushed. Temporary repairs were made to keep the road open but pipe replacement was needed for both structural and capacity issues. This project consisted of the demolition and removal of the existing 36" CMP under Broom Blvd. and the installation of 42-LF of a double 6' x 5' concrete box culvert.


Latest Update:

Design for Landscape and Stabilization improvements underway. 

  • Approved Budget: $387,880
  • Category: Category I
  • Expended to Date: $367,023
  • Designer: Tetra Tech
  • Contractor: Ryde Grading, Inc.
Copyright © 2015 Fayette County Administration. All rights reserved.