The three (3) 72” corrugated metal pipes (CMP) under Darren Drive have been evaluated for replacement. The current pipes are out of round. Each pipe has physical damage and large amounts of sediment present.
Survey is complete and the concept design for a triple 9' x 9' in conjunction with a triple 9' x 5' to allow for overflow has been approved.