Fayette County Transportation S.P.L.O.S.T.
City of Fayetteville
Per the May 2004
Resolution No. 2004-09, Exhibit A
- 85 Median Construction (LCI)
- 85 Median Engineering (LCI)
- 85 Streetscape Construction (LCI)
- 85 Streetscape Engineering (LCI)
- 92 (Forrest Avenue) Realignment Construction (LCI)
- 92 (Forrest Avenue) Realignment Engineering (LCI)
- 92 Connector R/W Acquisitions from Walgreens (Southside Master Plan)
- Bradley/Jimmie Mayfield Construction
- Bradley/Jimmie Mayfield Intersection – Design
- Church Street Improvements Design (LCI)
- Entry Gateways Design (LCI)
- Georgia Avenue Extension Construction (LCI)
- Georgia Avenue Extension Engineering (LCI)
- Grady, Stonewall & Booker Pedestrian Improvements
- Grady/Bradley Left Turn Signal
- Greenway Construction (LCI)
- Greenway Engineering (LCI)
- Hood Avenue Connector Construction (LCI)
- Hood Avenue Connector Engineering (LCI)
- Jimmie Mayfield – 92 to S. Jeff Davis Construction
- Jimmie Mayfield – 92 to S. Jeff Davis Design
- LaFayette Ave. and Glynn Street Traffic Signal (LCI)
- LaFayette Ave. Extension Construction (LCI)
- LaFayette Ave. Extension Engineering (LCI)
- Lanier Ave. Pedestrian Improvements – Const. (LCI)
- Lanier Streetscape Construction (LCI)
- Lanier Streetscape Engineering (LCI)
- Sidewalks and Multi-Use Trails (TEA 21 Reauthorized)
- Sidewalks and Multi-Use Trails Construction
- South Jeff Davis Shoulders
- SR 85/Hwy. 314/Jeff Davis
- Stonewall/85 Left Turn (LCI)
- Washington Street and Carver Street Design (LCI)
- White Road at Culvert
Please contact City of Fayetteville for additional information on City SPLOST projects http://www.fayetteville-ga-us.org/ .