This project was completed September 2023.
Project consisted of sliplining the existing deteriorated single 48" CMP culvert with 41 LF of single 42" smooth steel liner or HDPE.
- Approved Budget: $119,207.00
- Expended to Date: $6,664.00
This project was completed September 2023.
Project consisted of sliplining the existing deteriorated single 48" CMP culvert with 41 LF of single 42" smooth steel liner or HDPE.