170 Ridge Way



This project was completed September 2024.
project consists of the removal of the existing deteriorated 36-inch and 42-inch corrugated metal pipes (CMPs) beneath Ridge Way and extending outside of the existing right-of-way. The failing system will be replaced with 42-inch reinforced concrete pipe (RCP) under the road and 36-inch and 42-inch High Density Polyethylene pipe (HDPE) beyond the back of curb. 

  • Approved Budget: $228,742.00
  • Revised Budget: $370,028.00*
  • Category: Category II, Tier II
  • Expended to Date: $398,588.00
  • Designer: Pond