Updated 5/29/2026
Click Here for Project PICTURES
This is a GDOT bridge replacement project. The existing bridge, built in 1965, and consists of four spans of reinforced concrete deck girders on steel piles, concrete columns and concrete caps. The overall condition of the bridge is good. The design vehicle used for the bridge is below current standards, so the bridge is posted with weight restrictions.
- Approved Budget: $659,500.00
- Revised Budget: $726,399.00 (BOC 6/13/2024, Item #7)
- Category: Infrastructure Preservation & Improvements
- Expended to Date: $726,399.00
- Designer: Georgia Department of Transportation

