503 Westbridge Drive

The system located near 503 Westbridge Drive is a Category II, Tier I stormwater infrastructure preservation project existing of an 18-inch and a 48-inch corrugated metal pipe (CMP) system, is exhibiting signs of deformation and deterioration, and is in need of replacement.

  • Approved Budget: $205,870.00
  • Category: Category II, Tier I
  • Expended to Date: $5,425.00