130 Darren Drive

Click Here for Project Updates

The three (3) 72” corrugated metal pipes (CMP) under Darren Drive have been evaluated for replacement. The current pipes are out of round. Each pipe has physical damage and large amounts of sediment present.

Timeline:

2/26/2024 - Final Design

Latest Update:

1/21/2025: Survey is complete and final design of the triple 9' x 9' in conjunction with the triple 9' x 5' reinforced concrete box culvert system has been approved. This project is currently in the Right-of-Way acquisition phase. 

  • Approved Budget: $383,630.00
  • Revised Budget: $1,578,363.00*
  • Category: Category II, Tier II
  • Expended to Date: $91,917.00
  • Designer: Pond