The 36-inch Corrugated Metal Pipe (CMP) beneath Greenfield Circle shows signs of deterioration and is in need of replacement.
Latest Update:
01/21/2025: Survey is complete. This project is in the final stages of design for a 42-inch Reinforced Concrete Pipe with flumes.
- Approved Budget: $98,969.00
- Expended to Date: $0.00