This project consists of removing two 36-inch Corrugated Metal Pipes (CMP) and replacing it with two 42-inch Reinforced Concrete Pipes (RCP).
- Approved Budget: $100,073.00
- Expended to Date: $0.00
This project consists of removing two 36-inch Corrugated Metal Pipes (CMP) and replacing it with two 42-inch Reinforced Concrete Pipes (RCP).