104 Broom Blvd

Click Here for Project Updates

This project is complete.  The stormwater system and road were damaged during the December 2015 flood event. The headwall and inlet of the 36” corrugated metal pipe (CMP) were crushed. Temporary repairs were made to keep the road open but pipe replacement was needed for both structural and capacity issues. This project consisted of the demolition and removal of the existing 36" CMP under Broom Blvd. and the installation of 42-LF of a double 6' x 5' concrete box culvert.

Latest Update:

Design for Landscape and Stabilization improvements underway. 

  • Approved Budget: $387,880.00
  • Category: Category I
  • Expended to Date: $367,023.00
  • Designer: Tetra Tech
  • Contractor: Ryde Grading, Inc.
picture072-3  picture073-3  picture074-3

picture075-3  picture076-3  picture077-3

picture078-3  picture079-3  picture080-3

picture081-3  picture083-3  picture082-3

picture085-3  picture086-3  picture087-3

picture088-3  picture089-3  picture090-3

picture091-3  picture092-3  picture093-3

picture094-3  picture095-3  picture096-3

picture097-3  picture098-3  picture099-3